Lake District Hospital

Description:

A five-storey, 100,000 ft2 mixed-use medical, research, office, and retail building over underground parking. Cast-in-place concrete underground parkade with structural steel superstructure. Ductile eccentric braced frame lateral load system. Extensive stone and glass cladding. Raised access floor system for Dentistry levels. Delivered using construction management with pre-tendering of structural concrete and steel packages. Bush, Bohlman & Partners prepared full schematic designs for both steel and concrete schemes to test the market for most cost-effective solution

Location: Burns Lake, BC
Construction Cost: $42 Million